Retro-Commissioning
Throughout a systematic process of control optimizations in a sample of 50 buildings, Effective Development has identified more than 150 issues that affect their efficiency such as human behavior, software and hardware-equipment.
Our services refer to all kinds of buildings’ control systems and they are practically combined with our M&V procedure that maximize the results. Through Retro-commissioning we manage to reduce utility bills by 10-25% while the average payback time is usually less than 1.5 years.